Inuvik, NWT (2015 – 2017)

Inuvik, NWT (2015 – 2017)

WATER TREATMENT PLANT UPGRADE A larger facility with the capacity to treat 5,608 cubic meters of water per day, the Inuvik Water Treatment Plant features a unique structural design to accommodate the permafrost found at the Arctic Circle. The mechanical design...
Spur Valley, BC (2015)

Spur Valley, BC (2015)

WATER WELL SUPPLY UPGRADE This pump house is located in the Regional District of East Kootenay, and provides water, chemical analysis and dosing for the Spur Valley area.
Tilley, AB (2014 – 2015)

Tilley, AB (2014 – 2015)

DISTRIBUTION PUMPING AND RESERVOIR UPGRADE Located in the Hamlet of Tilley, Alberta, this project has upgraded the system to add 920 cubic meters of reservoir capacity, additional pumping capacity, a truck fill and a standby generator.
Black Velvet, AB (2014 – 2015)

Black Velvet, AB (2014 – 2015)

AGEING WAREHOUSE As the prime mechanical contractor, Simpson Industrial Services contributed to the design and construction of a 60,000-barrel warehouse for the storage and ageing of Black Velvet Whisky at the distillery in Lethbridge, Alberta. The largest challenge...
Cowley, AB (2013 – 2014)

Cowley, AB (2013 – 2014)

WATER TREATMENT PLANT CONSTRUCTION Simpson Industrial Services was the prime mechanical contractor for this 586,000 litre per day water treatment plant located in Cowley, Alberta. A PALL Aria Membrane Filtration System was installed during construction of this...